FTRFirst Time Right
Signature Series · New Delhi

Engineered
to perform.

Construction materials that end surface cracking, water ingress, corrosion and unreliable bonding — independent of workmanship variability.

Explore products Talk to an expert
ERP SmoothERP FiberNoSeep 2
No more cracksNo more leaksNo more rustFirst Time RightNo more cracksNo more leaksNo more rustFirst Time Right

0.0 MPa

ERP adhesion (ASTM D4541)

0.0%

NoSeep solid content

0 mm

PolyPlast repair depth

0

Saved per sq.ft. on finishing

The Signature Series

Eight products. Zero compromise.

View all products →
Repair

ERP Fiber

Elastomeric Repair Plaster

Coarse repair and reinforcement base. Improves tensile strength and supports crack control.

  • 20 kg pack
  • Used with 45 GSM nylon mesh
  • Max thickness 3–3.5 mm in two coats
ERP Fiber
Finish

ERP Smooth

Elastomeric Resurfacing Putty

Smooth, paintable finish that levels surfaces, bridges fine cracks and resists water absorption.

  • 20 kg pack
  • No primer, no sanding
  • Direct emulsion-ready
ERP Smooth
Waterproofing

NoSeep 1

Acrylic Elastomeric Membrane

NoSeep 1
FTR Signature Series
Waterproofing

NoSeep 2

Acrylic Elastomeric Membrane

NoSeep 2
FTR Signature Series
Protection

No Rust

Advanced Rust Protection

No Rust
FTR Signature Series
Adhesive

Block Bond

Polymerized Adhesive

Block Bond
FTR Signature Series
Repair

PolyPlast

Waterproof Plaster

FTR Signature Series
P
Adhesive

Vi+Ar

Waterproof Glue

FTR Signature Series
V

One coordinated wall

Three layers. One wall system.

Block Bond, ERP-Fiber and ERP-Smooth work as one sequence from block pasting to the final paint-ready surface.

Layer 03

ERP-Smooth

Elastomeric Resurfacing Putty

Seamless, paint-ready surface. Levelled with an aluminium tube, finished with a trowel. No primer. No sanding.

Explore the AAC system →

Hover a layer

Preventive measure

Six steps to a paint-ready wall.

All procedures →
Applying ERP with nylon mesh
1

Bond

Paste blocks with Block Bond. Fill larger voids with Block Bond and AAC pebbles.

2

Align

Check vertical and horizontal plumb with a 6 ft aluminium tube.

3

Reinforce

Load ERP-Fiber; embed 45 GSM nylon mesh while wet; remove excess.

4

Level

After 24 hours, apply the second ERP-Fiber coat and level evenly.

5

Finish

Apply ERP-Smooth at 2–3 mm; level, dry 8–10 hours and apply final coat.

6

Paint

Scrape dry in both directions to achieve a smooth, paintable surface.

Commercial comparison

Finish for ₹18, not ₹26.

ERP-Smooth removes primer, sanding and a second primer coat — lowering finishing cost per sq.ft. and cutting labour in half.

Conventional (primer + putty + sanding)26/sq.ft.
FTR ERP-Smooth system18/sq.ft.

Saving per sq.ft.

31%

Open cost calculator

Mission statement

Performance is the responsibility of the material — not an excuse left to execution.

Get it right the first time.

Call +91 9810156132