Engineered
to perform.
Construction materials that end surface cracking, water ingress, corrosion and unreliable bonding — independent of workmanship variability.



0.0 MPa
ERP adhesion (ASTM D4541)
0.0%
NoSeep solid content
0 mm
PolyPlast repair depth
₹0
Saved per sq.ft. on finishing
The Signature Series
Eight products. Zero compromise.
ERP Fiber
Elastomeric Repair Plaster
Coarse repair and reinforcement base. Improves tensile strength and supports crack control.
- — 20 kg pack
- — Used with 45 GSM nylon mesh
- — Max thickness 3–3.5 mm in two coats

ERP Smooth
Elastomeric Resurfacing Putty
Smooth, paintable finish that levels surfaces, bridges fine cracks and resists water absorption.
- — 20 kg pack
- — No primer, no sanding
- — Direct emulsion-ready

NoSeep 1
Acrylic Elastomeric Membrane

NoSeep 2
Acrylic Elastomeric Membrane

No Rust
Advanced Rust Protection

Block Bond
Polymerized Adhesive

PolyPlast
Waterproof Plaster
Vi+Ar
Waterproof Glue
One coordinated wall
Three layers. One wall system.
Block Bond, ERP-Fiber and ERP-Smooth work as one sequence from block pasting to the final paint-ready surface.
Layer 03
ERP-Smooth
Elastomeric Resurfacing Putty
Seamless, paint-ready surface. Levelled with an aluminium tube, finished with a trowel. No primer. No sanding.
Hover a layer
Preventive measure
Six steps to a paint-ready wall.

Bond
Paste blocks with Block Bond. Fill larger voids with Block Bond and AAC pebbles.
Align
Check vertical and horizontal plumb with a 6 ft aluminium tube.
Reinforce
Load ERP-Fiber; embed 45 GSM nylon mesh while wet; remove excess.
Level
After 24 hours, apply the second ERP-Fiber coat and level evenly.
Finish
Apply ERP-Smooth at 2–3 mm; level, dry 8–10 hours and apply final coat.
Paint
Scrape dry in both directions to achieve a smooth, paintable surface.
Commercial comparison
Finish for ₹18, not ₹26.
ERP-Smooth removes primer, sanding and a second primer coat — lowering finishing cost per sq.ft. and cutting labour in half.
Saving per sq.ft.
31%
Mission statement
Performance is the responsibility of the material — not an excuse left to execution.